01. Target: | No. of
worker x working hour x 60 / SMV x expected efficiency. |
02. Target: | 60/SMV. |
03.
Line/Team target: | (60/SMV) x
Present worker x Organization efficiency. |
04. Target
per day : | Working
hour x 60 x No. of operator / Target SMV. |
05.
Capacity: | Average of
total observe time x 1.66 + 15% Allowance / 60. |
06. Factory
capacity: | No. of
operator x working minutes + Present % x average factory efficiency. |
07.
Capacity per day: | Present
operator x working hour x organization efficiency x Attendance. |
08. Weekly
capacity: | No. of
operators x Absenteeism x Clock minutes per week x Average factory
efficiency. |
09. Marker
efficiency: | Area of
patterns in the marker / Total area of the marker x 100. |
10. Load: | (Contract
size x work content) contract 1+ (Contract size x work content) Contract 2
+ etc. |
11. Load: | Order
quantity x Work content (SMV of garments). |
12. Observe
time: | Total cycle
time / No. of cycle. |
13. Basic
time: | Average of
observe time X Rating %. |
14. Sam: | Basic time
x Allowance. |
15. Rating: | Observe
time x Standard rating / Standard rating. |
16. Cycle
time: | 60 / Team
target. |
17. Pitch
time: | Total SMV /
Present operator. |
18.
Efficiency: | Earn hour /
Available hour x 100 |
19.
Efficiency: | SMV / Total
time. |
20. Earn
hour: | SMV x
Production / 60. |
21.
Available hour: | Working
hour x Use machine. |
22.
Performance: | (Earn hour
/ Available hour - Off standard time) x 100. |
23.
Improvement: | 1-(Production
/ Capacity). |
24.
Balancing efficiency: | 1-Balancing
loss. |
25. Balancing
loss: | AML-TML/AMLx100. |
26.
Standard time: | Net
operation time x (1+ Ratio of loss time). |
27. Daily
output: | Working
hours (seconds) + Standard time. |
28. Output
per operator: | Work hours
(second) / Total time of operations. |
29.
Required No. of operators: | Targeted
daily output / Daily output per operator. |
30. Target
daily capacity: | Daily work
hours / Standard process time (SPT). |
31. Daily
capacity per worker: | Daily
capacity / No. of workers = Daily Work hours / Standard total processing. |
32.
Organization efficiency: | Pitch time
/ Bottle neck process time (x 100) = 100/140 x 100 = 71.4% |
33. Upper
limit: | Pitch time
/ Target organization efficiency = 100 / 0.85 = 117.6 seconds. |
34. Lower
limit: | 2 x Pitch
time - Upper limit = 2 x 100 - 117.6 = 82.4 seconds. |
35. Planned
daily work flow: | Daily work
hours / Standard process time (SPT) x organization efficiency. |
36.
Accumulated average time: | Daily work
hours/Accumulated x No.of days x standard No.of workers in the group/No. of
pieces produced. |
37. SMV: | Basic time
+ Allowance time + bundle time. |
38. DHU: | No. of
deffect observe / No. of garments checked. |
39. Booking
fabric K.G: | Order
quantity / 12 x Fabric consumption per doz. |
40.
Garments K.G.: | Total
receive fabric kg - (Save return kg + Jute kg + Wastage fabric kg) |
41. Input
to sewing pcs: | Total in
pcs - (Print Embroidery short & wastage + Cutting wastage pcs.) |
39. Fabric
consumption (CM): | Length x
chest x 2 x GSM / 1000 / 10000 x 12 + Wastage%. |
40. Fabric
consumption (Inch): | Length x
chest x 2 x GSM / 1000 / 1550 x 12 + Wastage%. |
TML: | Theoretical
machine level. |
AML: | Actual
machine level. |
AQL : | Acceptable
quality level. |
PMTS: | Pre method
time study. |
GSM: | Gram squire
per miter. |
BHT: | Bundle
handle time. |
SUM: | Standard
allocated minutes. |
TS: | Technical
allowance. |
TP: | Personal
allowance. |
TER: | Recovery
allowance. |
TV: | Total
allowance. |
WH: | Working
hour. |
No comments: