Important Formula For IE Department

Important Formula For IE Department

01. Target:

No. of worker x working hour x 60 / SMV x expected efficiency.

02. Target:

60/SMV.

03. Line/Team target: 

(60/SMV) x Present worker x Organization efficiency.

04. Target per day :

Working hour x 60 x No. of operator / Target SMV.

05. Capacity:

Average of total observe time x 1.66 + 15% Allowance / 60.

06. Factory capacity:

No. of operator x working minutes + Present % x average factory efficiency.

07. Capacity per day:

Present operator x working hour x organization efficiency x Attendance.

08. Weekly capacity:

No. of operators x Absenteeism x Clock minutes per week x Average factory efficiency.

09. Marker efficiency:

Area of patterns in the marker / Total area of the marker x 100.

10. Load:

(Contract size x work content) contract 1+ (Contract size x work content) Contract 2 + etc.

11. Load:

Order quantity x Work content (SMV of garments).

12. Observe time:

Total cycle time / No. of cycle.

13. Basic time:

Average of observe time X Rating %.

14. Sam:

Basic time x Allowance.

15. Rating:

Observe time x Standard rating / Standard rating.

16. Cycle time:

60 / Team target.

17. Pitch time:

Total SMV / Present operator.

18. Efficiency:

Earn hour / Available hour x 100

19. Efficiency:

SMV / Total time.

20. Earn hour:

SMV x Production / 60.

21. Available hour:

Working hour x Use machine.

22. Performance:

(Earn hour / Available hour - Off standard time) x 100.

23. Improvement:

1-(Production / Capacity).

24. Balancing efficiency:

1-Balancing loss.

25. Balancing loss:

AML-TML/AMLx100.

26. Standard time:

Net operation time x (1+ Ratio of loss time).

27. Daily output:

Working hours (seconds) + Standard time.

28. Output per operator:

 Work hours (second) / Total time of         operations.

29. Required No. of operators:

Targeted daily output / Daily output per operator.

30. Target daily capacity:

Daily work hours / Standard process time (SPT).

31. Daily capacity per worker:

Daily capacity / No. of workers = Daily Work hours / Standard total processing.

32. Organization efficiency:

Pitch time / Bottle neck process time (x 100) = 100/140 x 100 = 71.4%

33. Upper limit:

Pitch time / Target organization efficiency = 100 / 0.85 = 117.6 seconds.

34. Lower limit:

2 x Pitch time - Upper limit = 2 x 100 - 117.6 = 82.4 seconds.

35. Planned daily work flow:

 Daily work hours / Standard process time   (SPT) x organization efficiency.

36. Accumulated average time:

Daily work hours/Accumulated x No.of days x standard No.of workers in the group/No. of pieces produced.

37. SMV:

Basic time + Allowance time + bundle time.

38. DHU:

No. of deffect observe / No. of garments checked.

39. Booking fabric K.G:

 Order quantity / 12 x Fabric consumption   per doz.

40. Garments K.G.:

Total receive fabric kg - (Save return kg + Jute kg + Wastage fabric kg)

41. Input to sewing pcs:

 Total in pcs - (Print Embroidery short &   wastage + Cutting wastage pcs.)

39. Fabric consumption (CM):

 Length x chest x 2 x GSM / 1000 / 10000   x 12 + Wastage%.

40. Fabric consumption (Inch):

 Length x chest x 2 x GSM / 1000 / 1550 x  12 + Wastage%.

TML:

Theoretical machine level.

AML:

Actual machine level.

AQL :

Acceptable quality level.

PMTS:

Pre method time study.

GSM:

Gram squire per miter.

BHT:

Bundle handle time.

SUM:

Standard allocated minutes.

TS:

Technical allowance.

TP:

Personal allowance.

TER:

Recovery allowance.

TV:

Total allowance.

WH:

Working hour.

 